Water Department

Water Treatment Plant

The City of Odessa Water Treatment Division began producing potable water in 1922 in a surface water treatment plant. This plant remained in operation until August 8, 1997 when the City of Odessa officially began treating water at a new groundwater treatment plant. The design flow for this new plant is 1.6 million gallons per day. We are dedicated to producing and distributing good, potable water for our customers.

Water Distribution System

After water has been treated at our water treatment plant, it travels to a 1 million gallon standpipe. From this standpipe, the potable water travels throughout the approximately 30 miles of piping that makes up our water distribution system. This piping ranges in size from 2” to 12” in diameter. Attached throughout our Water Distribution System are over 2,000 water services, 222 fire hydrants, and 176 valves.

Staff Information

Our staff currently includes two (2) Class A Operators and two (2) Class B Operators.


Water Quality Reports 

2024 CCR Rpt. 

2023 CCR Rpt. 

2022 CCR Rpt. 

2021 CCR Rpt. 

2020 CCR Rpt.